+220 437 6090
info@nawec.gm
Mon – Fri: 8:00 AM – 4:00 PM
Home / News / The Gambia Water and Sanitation Project (WASAP) — Environmental and Social Documents

The Gambia Water and Sanitation Project (WASAP) — Environmental and Social Documents

September 2, 2026 Investor Relations, latest_news, Press Releases, Public Notice
The Gambia Water and Sanitation Project (WASAP) — Environmental and Social Documents
The Gambia Water and Sanitation Project (WASAP) – Environmental & Social Documents | NAWEC
NAWEC Logo

Mamady Maniyang Highway, Kanifing  ·  P.O. Box 609, Banjul, The Gambia  ·  Tel: (+220) 5289009  ·  info@nawec.gm

WASAP  ·  P513113
Project Partners: 🌍 World Bank — IDA Financing Republic of The Gambia NAWEC — Implementing Entity
Environmental & Social Disclosure  ·  WASAP  ·  August 2026

The Gambia Water and Sanitation Project — Environmental & Social Documents

NAWEC, as the Implementing Entity for the Gambia Water and Sanitation Project (WASAP — P513113), hereby publishes the following Environmental and Social documents for public disclosure in accordance with World Bank Environmental and Social Standards (ESSs).

Project: WASAP — P513113
Funder: World Bank (IDA)
Implementing Entity: NAWEC
Documents Published: 4 — September 2026
📢

Public Disclosure Notice

These documents are published by NAWEC in fulfilment of its disclosure obligations under the World Bank Environmental and Social Framework (ESF) and the Environmental and Social Commitment Plan (ESCP) for the Gambia Water and Sanitation Project (WASAP — P513113). Members of the public and affected stakeholders are invited to review these documents and submit feedback through NAWEC’s Grievance Redress Mechanism.

Project Background

The Gambia Water and Sanitation Project (WASAP — P513113) is financed by the International Development Association (IDA), World Bank Group. The Republic of The Gambia is the Recipient and NAWEC is the Project Implementing Entity.

The Project’s main development objective is to increase access to reliable water supply and improve sanitation services in The Gambia. It includes infrastructure development across water production, treatment, distribution, and sanitation components, with a strong commitment to environmental and social safeguards throughout implementation.

NAWEC is required to implement the Project in accordance with World Bank Environmental and Social Standards (ESSs) and the Environmental and Social Commitment Plan (ESCP) agreed between the Republic of The Gambia, NAWEC, and the World Bank.

P513113
World Bank Project ID
Gambia Water & Sanitation Project
IDA Funded
Financing Source
International Development Association
4 Documents
Published
ESIA · ESIA Kotu · ESCP · RPF

Published Documents

Environmental & Social Impact Assessment (ESIA) — Draft

Environmental and Social Impact Assessment of the Gambia Water and Sanitation Project (GWASAP)

This draft ESIA covers the environmental and social impacts of the Gambia Water and Sanitation Project (P513113), including water production, water treatment systems, distribution infrastructure, and ancillary works. It includes an executive summary, project description, institutional framework, and assessment of environmental and social risks and mitigation measures across all project components.

📅 August 2026
🏷 DRAFT — for public disclosure and consultation
🏢 NAWEC — PIU
⬇ Download ESIA (PDF)
Environmental & Social Impact Assessment (ESIA) — Fecal Sludge Treatment Plant

ESIA of the Fecal and Sludge Treatment Plant in Kotu

This ESIA specifically addresses the environmental and social impacts of the proposed Fecal and Sludge Treatment Plant in Kotu, forming part of the broader Gambia Water and Sanitation Project (P513113). The document covers the proposed project overview and rationale, ESIA scope and objectives, methodological approach, stakeholder consultations, site visits, and baseline data collection across spatial and temporal boundaries.

📅 August 2026
📍 Kotu, The Gambia
🏢 PIU Reviewed
⬇ Download ESIA — Kotu (PDF)
Environmental & Social Commitment Plan (ESCP) — Negotiated Version

Environmental and Social Commitment Plan (ESCP) — The Gambia Water and Sanitation Project (WASAP)

This ESCP sets out the material measures and actions that the Republic of The Gambia and NAWEC shall carry out during implementation of the Gambia Water and Sanitation Project (P513113), in accordance with World Bank Environmental and Social Standards (ESSs). It defines timeframes, institutional arrangements, staffing, training, monitoring, reporting, and grievance management requirements. The ESCP is a binding part of the Financing Agreement between the World Bank (IDA) and the Republic of The Gambia.

📅 27 August 2026
🏷 Negotiated Version
🌍 World Bank — IDA · Official Use
⬇ Download ESCP (PDF)
Resettlement Policy Framework (RPF) — Draft

Draft Resettlement Policy Framework (RPF) — Gambia Water and Sanitation Project (GWASAP)

This draft Resettlement Policy Framework (RPF) sets out the principles, policies, and procedures to be followed in the event that project activities under the Gambia Water and Sanitation Project (P513113) result in involuntary resettlement, loss of assets, or restriction of access to resources. It is prepared in accordance with World Bank Environmental and Social Standard 5 (ESS5) on Land Acquisition, Restrictions on Land Use and Involuntary Resettlement, and provides the framework for preparing site-specific Resettlement Action Plans (RAPs) as required during project implementation.

📅 2026
🏷 DRAFT — for public disclosure and consultation
📋 World Bank ESS5 — Involuntary Resettlement
⬇ Download RPF (PDF)

Project Scope

💧

Water Production & Ancillary Works

Development of water production infrastructure including boreholes, intake structures, and ancillary works to increase water supply capacity.

🏭

Water Treatment Systems

Construction and upgrading of water treatment facilities, including a new treatment plant in Bansang, to ensure safe and reliable water supply.

🚰

Water Distribution Infrastructure

Expansion and rehabilitation of distribution networks and smart water meter installation to improve water access across The Gambia.

🏗️

Fecal Sludge Treatment — Kotu

Construction of a Fecal and Sludge Treatment Plant in Kotu to improve sanitation infrastructure and faecal sludge management in the Greater Banjul Area.

“NAWEC shall implement the Project in accordance with the Environmental and Social Standards (ESSs) and the Environmental and Social Commitment Plan (ESCP), in a manner acceptable to the World Bank. The ESCP is a part of the Financing Agreement between the Republic of The Gambia and the International Development Association.”

Back to News
NAWEC Assistant
Online
Powered by NAWEC