{"id":838,"date":"2021-05-31T13:32:22","date_gmt":"2021-05-31T13:32:22","guid":{"rendered":"https:\/\/nawec.gm\/?p=838"},"modified":"2021-05-31T13:32:22","modified_gmt":"2021-05-31T13:32:22","slug":"specific-procurement-notice-request-for-bids-plant-design-supply-and-installation-of-phase-2-of-transmission-infrastructures-modernization-in-greater-banjul-area-primary-and-secondary-substations","status":"publish","type":"post","link":"https:\/\/nawec.gm\/?p=838","title":{"rendered":"Specific Procurement Notice Request for Bids Plant Design, Supply and Installation of Phase 2 of Transmission Infrastructures Modernization in Greater Banjul Area, Primary and Secondary Substations"},"content":{"rendered":"<p style=\"text-align: center;\"><strong>Specific Procurement Notice<\/strong><br \/>\n<strong>Request for Bids<\/strong><br \/>\n<strong>Plant<\/strong><\/p>\n<p style=\"text-align: center;\">\n<strong>Design, Supply and Installation of<\/strong><br \/>\n<strong>Phase 2 of Transmission Infrastructures Modernization in Greater Banjul Area, Primary and Secondary Substations<\/strong><\/p>\n<p>Employer: National Water and Electricity Company Limited (NAWEC)<br \/>\nProject: Gambia Electricity Restoration and Modernization Project (GERMP)<br \/>\nCountry: The Gambia<br \/>\nLoan No. \/Credit No. \/ Grant No.: D-309GM<br \/>\nRFB No: GM-NAWEC-187669-CW-RFB<br \/>\nIssued on: 31st May, 2021<\/p>\n<p>Click on the link below for the bidding document.<\/p>\n<p><a href=\"https:\/\/nawec.gm\/wp-content\/uploads\/2021\/05\/SPN-GBA-Substations.pdf\">SPN GBA Substations<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Specific Procurement Notice Request for Bids Plant Design, Supply and Installation of Phase 2 of Transmission Infrastructures Modernization in Greater Banjul Area, Primary and Secondary Substations Employer: National Water and Electricity Company Limited (NAWEC) Project: Gambia Electricity Restoration and Modernization Project (GERMP) Country: The Gambia Loan No. \/Credit No. \/ Grant No.: D-309GM RFB No: [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[3],"tags":[46,31,10,45],"class_list":["post-838","post","type-post","status-publish","format-standard","hentry","category-latest_news","tag-bidding","tag-electricity","tag-nawec","tag-substations"],"publishpress_future_action":{"enabled":false,"date":"2026-04-23 13:21:15","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/nawec.gm\/index.php?rest_route=\/wp\/v2\/posts\/838","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/nawec.gm\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/nawec.gm\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/nawec.gm\/index.php?rest_route=\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/nawec.gm\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=838"}],"version-history":[{"count":2,"href":"https:\/\/nawec.gm\/index.php?rest_route=\/wp\/v2\/posts\/838\/revisions"}],"predecessor-version":[{"id":840,"href":"https:\/\/nawec.gm\/index.php?rest_route=\/wp\/v2\/posts\/838\/revisions\/840"}],"wp:attachment":[{"href":"https:\/\/nawec.gm\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=838"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/nawec.gm\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=838"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/nawec.gm\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=838"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}