PUBLIC ANNOUNCEMENT NAWEC informs the general public that the current electricity situation in the GBA is as a result of some maintenance being carried out on two engines in both Brikama and Kotu Power stations since on Monday 4th September, 2017. This has made it extremely difficult for NAWEC to distribute normal supply to all customers at the same time thus stretching the load shedding rooster. Consequently, it has led to the low pressure or lack of water being experienced in the water supply system. NAWEC assures its esteemed customers that extra efforts will be made to keep the rest of the generators available during the period in order to minimize the load shedding as a result of the absence of the engines. NAWEC apologizes for any inconvenience this may cause and promises to restore normal supply as soon as works on the engines are completed. Thank you.

Please enter the email address associated with your User account. Your username will be emailed to the email address on file.

Health & Safety


     Contact Us

     53 Mamadi Maniyang  Highway
     Kanifing, K.M.C. 
     P.O.Box 609, Banjul
     The Gambia
     Tel:   +220 4376607 / 4376608
     Fax:  +220  4375990
     Mail: This email address is being protected from spambots. You need JavaScript enabled to view it.
     Web: www.nawec.gm

Nawec © 2012 Copyright All rights reserved

2012 Powered By Jittercoms
Powered by Joomla 1.7 Templates designed by webhosting