PUBLIC ANNOUNCEMENT NAWEC informs the general public that the current electricity situation in the GBA is as a result of some maintenance being carried out on two engines in both Brikama and Kotu Power stations since on Monday 4th September, 2017. This has made it extremely difficult for NAWEC to distribute normal supply to all customers at the same time thus stretching the load shedding rooster. Consequently, it has led to the low pressure or lack of water being experienced in the water supply system. NAWEC assures its esteemed customers that extra efforts will be made to keep the rest of the generators available during the period in order to minimize the load shedding as a result of the absence of the engines. NAWEC apologizes for any inconvenience this may cause and promises to restore normal supply as soon as works on the engines are completed. Thank you.

The Corporate Service Division is in charge of all Planning Aspects of the System expansion for Water Electricity and Sewerage services. In this respect, the Division is the focal point within the Institution for all Studies and Services rendered by foreign engineering and contracting companies. Regular small scale extension of the network is part of the division’s activity. The Division is expected to coordinate all project activities from conception to commissioning. Water and Electricity networks expansion is in progress covering the entire West Coast Region.

The Corporate Services Division has been engaged in the following activities per Department:


Electricity Planning Department

The Venezuela Project is main activity of this Department. Activities include:

·         Electrification of GBA
·         The electrification of province,
·         Brikama Kabafita Layout design,   
·         Electrifying the Brikama Industrial Zone.
·         GIS section is to be updating water extensions and service connections into the existing GIS system


Corporate Planning Department

Key activities of this Department include:
·         Preparations of monthly and annual company reports.
·         Short, Medium and long term planning
·         Project identification and development and implementation activities
·         Focal Department for Regulation ie PURA (Data and tariff related among others)
·         M&E Focal Department
·         Liaison Department for investors
·         Focal Department for issues relating to Municipalities and Area councils Review of policies, procedures and process documents
·         Participate in projects procurement processes
·         Focal Department for climate change ie National Appropriate Mitigation Actions (NAMA)

 

Water Planning Department

·         Involved in the planning of increased access to NAWEC water network by the urban, sub-urban and rural communities
·         Mapping aged and asbestos network for replacement
·         Working on the ORIO Project for water supply to 10 provincial townships
·         Have prepared and developed design and BoQ for the US$20 million Indian Government Line of Credit with the EXIM bank of India
·         Participating in the Kotu Ring and Gunjur  Project which is under implementation

 

 

Health & Safety


     Contact Us

     53 Mamadi Maniyang  Highway
     Kanifing, K.M.C. 
     P.O.Box 609, Banjul
     The Gambia
     Tel:   +220 4376607 / 4376608
     Fax:  +220  4375990
     Mail: This email address is being protected from spambots. You need JavaScript enabled to view it.
     Web: www.nawec.gm

Nawec © 2012 Copyright All rights reserved

2012 Powered By Jittercoms
Powered by Joomla 1.7 Templates designed by webhosting